Office from the floor

Pros transfer bridge and gantry crane on the radio control

 

Regardless of the type of control panel:

– Working cranes, transferred to the radio remote control especially convenient because of the small size and low weight of the control panel.

– Translated to manage from the floor overhead and gantry cranes make it possible not to use a crane, and its responsibilities are to carry out basic slingers or workers – fitters, machinists, operators, thus saving on the wage fund.

– After the transfer of the crane on the radio control capacity of up to 10 tons (inclusive), the crane to be peeled from registration by reason of its transition to the category is not recorded.

Cranes with r / n over 10t may be limited to 10 tons and loading capacity, however, if this does not require the production technology and also transferred to the radio control.

– PA, cranes translated into control of the floor with the help of radio safer to work for the personnel of the enterprise, since slinger is not attached to the crane short wired remote control and can reside on the load to be lifted at a safe distance outside the hazardous production factors, such as acid vapors, a large gas content, high ambient temperature, etc.).